Boost · Checklist

Checklist: trust this GPM number?

Short field checks before you pipe off a flow figure. Not a second how-to essay.

Heat-to-flow pipe loop for job-site GPM checks
  1. Confirm load units: BTU/h or kW (not mixed).
  2. Confirm design ΔT and whether it is °F or K.
  3. Confirm fluid: water or glycol percent if mix is known.
  4. Reject a GPM that assumed 20°F when the job is a heat pump 10K/5K loop.
  5. Run free Flow mode with the same inputs.
  6. Switch US/metric once to catch unit slips.
  7. Write the GPM on the job note before pipe selection.
  8. If glycol is in play, remember corrections are Pro.

Deeper method: BTU to GPM guide.

Home · Get the app