Boost · Checklist

Expansion tank: collect these numbers first

Input order for acceptance and pre-charge. Verify the tank label after.

Expansion tank cutaway for pre-charge checks
  1. System water volume estimate (boiler + piping + emitters).
  2. Cold fill pressure.
  3. Maximum operating temperature.
  4. Relief valve setting.
  5. Tank model and labeled pre-charge from the manufacturer.
  6. Run Pro Expansion tank (or the free first reveal) with those inputs.
  7. Set pre-charge on the empty tank per manufacturer instructions before connecting.
  8. Do not treat the app number as a substitute for the OEM sheet or local code.

Guide: expansion tank sizing.

Home · Get the app